IKEGAHARA SUPPLY IS FINISHED

Mashiki Solar Plant has been finished
16th mayo 2017
ASTURMADI RENEERGY LOADING SYSTEM
11th julio 2017

IKEGAHARA SUPPLY IS FINISHED

ASTURMADI RENEERGY has finished the supply of a new solar photovoltaic plant located in Japan with a high technical complexity due to the orography and soil characteristics.

The assembly work is planned to be finished in October and the Solar Plant must be working before 2018.