6th julio 2017

IKEGAHARA SUPPLY IS FINISHED

ASTURMADI RENEERGY has finished the supply of a new solar photovoltaic plant located in Japan with a high technical complexity due to the orography and soil […]
16th mayo 2017

Mashiki Solar Plant has been finished

The Mashiki Photovoltaic Solar Plant Project on Kyushu Island, Kumamoto Prefecture in Japan has been finished. It covers an area of 85 hectares, 150.570 solar modules […]
24th febrero 2017

RENEERGY STEEL-CS SOFTWARE

  RENEERGY, in collaboration with the Cruzeiro do Sul University (Sao Paulo, Brazil) and the LDH Engineering Company, has developed the STEEL-CS Software. This idea arises […]
22nd febrero 2017

THE SECOND ENERGY AUCTION HAS ALREADY BEEN IN MEXICO

THE SECOND ENERGY AUCTION HAS ALREADY BEEN IN MEXICO. ASTURMADI RENEERGY S.L. is betting to strengthen its position by the Mexican market after the second electricity […]
15th febrero 2017

DUPLICATE THE EFFICIENCY OF SOLAR PHOTOVOLTAIC PANELS

SPANISH AND AMERICAN RESEARCHERS WORK TOGETHER IN A PROJECT TO DUPLICATE THE EFFICIENCY OF SOLAR PHOTOVOLTAIC PANELS. The universities of Yale, Illinois and Rey Juan Carlos […]
7th noviembre 2016

Technical Product Due Diligence

Last 18 October 2016, RENEERGY obtained the Technical Product Due Diligence Report of their single axis solar tracker by Astrom Technical Advisors, S.L (ATA)