Facilities

Facilities

0 m2

Last generation factory

25,000 m² of factory space equipped with cutting-edge technology, ensuring precision and innovation in every structure manufactured by reneergy.

0 Ton

Raw material warehouse

Raw material warehouse with an average volume of 10,000 tonnes of steel coils, to guarantee price stability and significantly reduce delivery times.

0 GW/año

Agile and flexible production capacity

With an internal production capacity of 2.4 GW per year, reneergy quickly adapts to the specific needs of each project, offering tailor-made solutions without delay.

+ 0 MW

Finished product warehouse

Finished product warehouse covering more than 5,000 m² with a capacity exceeding 150 MW, designed to guarantee continuity in the flow of loads and ensure the logistics chain for projects.

+ INNOVATION

Technology centre and testing ground

A space dedicated to innovation and the pursuit of excellence in solar energy solutions to offer top-quality products.

+Green

Efficient production lines, green energy and mobility

With headquarters and factory in Asturias, Spain, reneergy ensures sustainable practices in its production processes, using state-of-the-art facilities designed to maximise efficiency and minimise environmental impact.

Discover our facilities

Direct hanging

Pre-drilling

Micropiles

Screw

Wall footing

Ballasted foundation